Weldon Spring City Hall Facility Needs Assessment 2.0

3/21/2025 | Posted in: News
The elected officials and City Staff have received a second Facility Needs Assessment from Navigate Building Solutions. This assessment is more in-depth than the previous report, addressing current conditions and staff space needs.
The current building is a ranch-style home that has been adapted for use as offices. The new assessment reiterates the findings of the 2024 study: The current building is inadequate for the City’s current and future needs and is not ADA-compliant. The study’s recommendation is for a larger, ADA-compliant building that is better designed for the provision of city services and for possible future expansion of services as needed.
The Study provided recommendations for three different options:
  • Renovate City Hall                                   
  • Renovate and Expand City Hall                        
  • Build New sqft, City Hall                        
View the City Hall Planning Study.

*City Hall Planning Study, Navigate Building Solutions 01/23/2025
 
  Back to the list